Mini Piling Embankment Stabilisation: Piletec Geotechnical mobilised two mini drilling rigs to carry out stabilisation work over 80m of failing embankment.
Due to the site location and extremely restricted acc...
Soil Nailing This contract was part of the Shortlands Junction scheme in Kent and included installing approximately 1,300 soil nails and 40, 000 square metres of facing.
The slope was cut at 60 degrees then up...
Geothermal Drilling Piletec Geotechnical were contracted to drill five boreholes to depths varying from 90m to 120m. Due to the tricky ground conditions the original Contractor pulled off site, Piletec were able to mobil...